How much paint a 150 to 400 sq ft shop needs, how long the work takes, and where the money actually goes.
Short answer: A typical 200 sq ft mobile shop with 10 ft walls has roughly 600 to 700 sq ft of wall and 200 sq ft of ceiling to paint. That needs about 5 to 6 litres of primer and 12 to 14 litres of emulsion for two coats, plus separate material for the shop front, shutter and plinth. Allow three to four working days including drying. Labour and preparation usually cost more than the paint, so do not economise on the primer to save a few hundred rupees.
Shop owners usually ask the price per litre first. The more useful question is how many litres the shop actually needs, because that is what decides the bill.
Please note: The figures below are planning estimates for smooth, previously painted plaster. Rough, porous or previously distempered walls can need 20 to 30 per cent more. Confirm quantities and prices with your dealer against your actual shop.
How do I measure my shop?
- Measure the length and width of the shop in feet.
- Wall area: add length and width, double it, then multiply by the wall height. For a 10 by 20 ft shop with 10 ft walls, that is (10 + 20) x 2 x 10 = 600 sq ft.
- Ceiling area: length times width, so 200 sq ft.
- Subtract roughly 20 sq ft for each large door or window opening.
- Measure the shop front, shutter and plinth separately, since they take different products.
How much paint will I need?
| Shop size (10 ft walls) | Wall area | Primer | Emulsion, 2 coats | Ceiling paint |
|---|---|---|---|---|
| 10 x 15 ft | about 500 sq ft | 4 to 5 L | 10 to 12 L | 3 to 4 L |
| 10 x 20 ft | about 600 sq ft | 5 to 6 L | 12 to 14 L | 4 to 5 L |
| 15 x 20 ft | about 700 sq ft | 6 to 7 L | 14 to 16 L | 6 to 7 L |
| 20 x 20 ft | about 800 sq ft | 7 to 8 L | 16 to 19 L | 8 to 9 L |
Add separately: exterior emulsion and primer for the shop front, epoxy primer and enamel for the shutter and grilles, and a foundation coating for the plinth. A small shop front is usually 3 to 5 litres of exterior emulsion for two coats.
How long does the work take?
| Day | Work | Shop open? |
|---|---|---|
| Day 1 | Clear stock, mask, scrape and repair | Closed or part open |
| Day 2 | Primer, then ceiling | Closed |
| Day 3 | Two coats on walls | Closed |
| Day 4 | Shop front, shutter, plinth, touch-ups | Can part open |
| Day 5 | Restock and clean | Open |
If closing for three days is not possible, the work can be split. See painting a shop without closing it.
Where does the money go?
- Labour and preparation: usually the largest share, and the part that decides the finish.
- Primer: a small share of the cost, a large share of the result.
- Topcoat: what most people compare on price.
- Shutter and grille work: a separate line item, often forgotten in the first quotation.
- Lost trading days: real money, and worth planning around.
What should I not economise on?

An acrylic primer with fibre technology that resists alkali, damp and efflorescence and lifts topcoat coverage by 15 to 20%.
Primer · Anti-alkaliView Super Seal →
An interior emulsion with excellent whiteness and a soft sheen, made with GLATT Technology.
Interior sheen · Tinted at your dealerView Dew →
A single-pack epoxy primer for steel and iron. Surface dry in about 4 minutes, full cure in 24 hours, with chemical, abrasion and moisture resistance.
Grey & Black · MetalView Prestige →Super Seal is an acrylic primer with fibre technology that resists alkali, damp and efflorescence and lifts topcoat coverage by 15 to 20 per cent. Skipping primer to save money usually costs more, because the topcoat then needs an extra coat to cover evenly.
The same applies to the shutter. Enamel straight onto bare steel will look fine for one season and then bubble at the slats, and redoing it means stripping first.
Related: mobile shop paint colours and buying paint online vs at a dealer.
Frequently asked questions
How much paint is needed for a 200 sq ft shop?
About 5 to 6 litres of primer and 12 to 14 litres of emulsion for two coats on the walls, plus ceiling paint.
How do I calculate wall area for a shop?
Add the length and width, double it, then multiply by the wall height. Subtract about 20 sq ft per large opening.
How many days does it take to paint a small shop?
Three to four working days including drying, plus a day to restock.
Can I skip the primer to save money?
No. Primer improves coverage by 15 to 20 per cent, so skipping it usually costs an extra topcoat.
Does the shutter need separate paint?
Yes. Steel shutters need an epoxy primer and enamel, which are separate from the wall paint budget.
Plan it before you buy it